Default Changing Runway Ops

How do controllers go about changing runways operations at major airports. For example here in PHX the main runways for use are 07L/R and 08.

But depending on wind,noise abatement,time of day or just whatever they'll switch over to the 25's & 26. So my question is when you have all traffic coming in to one or several runways of the same headings on similar approach cooridors to said runway(s) is changing runways easy or complicated?

For example I hear that in busy airports like LAX or any of the busy NYC airports changing runways is a severe headache. Also who makes the call to change runway ops? The tower controllers or approach contollers,and how do both work together in a runways change operation?
__________________
Rear Admiral

www.gayviator.com

Maximillian Pegasus

Maximillian_Jenius is offline  
Old November 7th, 2006, 19:39   #2
MusketeerMan
Old Skool
 
MusketeerMan's Avatar
 
Join Date: Jun 2006
Location: Elk Grove, CA
Posts: 1,881
Default Re: Changing Runway Ops

Thanks for asking this...I've wondered the same many times!!
__________________
JBDaP
MusketeerMan is offline  
Old November 7th, 2006, 19:46   #3
surreal1221
Old Skool
 
surreal1221's Avatar
 
Join Date: Jul 2006
Location: Alpha Tango Lima
Posts: 8,655
Send a message via AIM to surreal1221
Default Re: Changing Runway Ops

TWR controllers make the call. Actually, the supervisor on shift will make the call.

A number of factors that will play into it are the winds, time of day, etc etc. Each facility has their own SOPs that will dictate what conditions have to be met before they will switch runways. A majority of airports have a calm wind runway configuration, and for it to change, conditions must fall into another category of configuration.

It can be a headache. Just imagine a frontal passage, where winds out ahead of the front are from the SW, and after passage they shift quickly to the NW. Now imagine this wind shift during peak traffic at any number of Class B fields. Combined with the convection associated with cold FROPA, the STARs are getting messy (TRACON), holds are occuring (ENROUTE), and a shift occurs in the RWY config (TWR). All starting from the bottom up.

All in a days work.
__________________
AGI.MEI.CFI.CFII.FO.CRJ2 | Josh |The TRoP | Ramble On |ALPA |


Your DD-214 is where?
surreal1221 is offline  
Old November 7th, 2006, 19:52   #4
Maximillian_Jenius
Old Skool
 
Maximillian_Jenius's Avatar
 
Join Date: Nov 2003
Location: KPHX, KFFZ, KIWA
Posts: 18,661
Send a message via AIM to Maximillian_Jenius Send a message via MSN to Maximillian_Jenius Send a message via Yahoo to Maximillian_Jenius Send a message via Skype™ to Maximillian_Jenius
Default Re: Changing Runway Ops

Does it get difficult sequencing approaching traffic from contact with departing traffic as the switch is made?
__________________
Rear Admiral

www.gayviator.com

Maximillian Pegasus

Maximillian_Jenius is offline  
Old November 7th, 2006, 20:27   #5
surreal1221
Old Skool
 
surreal1221's Avatar
 
Join Date: Jul 2006
Location: Alpha Tango Lima
Posts: 8,655
Send a message via AIM to surreal1221
Default Re: Changing Runway Ops

Quote:
Originally Posted by Maximillian_Jenius View Post
Does it get difficult sequencing approaching traffic from contact with departing traffic as the switch is made?
Well, usually. . . no. The TWR and TRACON will come to an agreement who the last arrival for the present configuration is. After that arrival, any new arrivals will begin to be sequenced for the new configuration. It just means that, the TWR can't release the depatures on the new configuration until after that last arrival comes in. But once again, I must stress. . . this is the general process. Each facility is different.
__________________
AGI.MEI.CFI.CFII.FO.CRJ2 | Josh |The TRoP | Ramble On |ALPA |


Your DD-214 is where?
surreal1221 is offline  
Old November 8th, 2006, 10:02   #6
TFaudree_ERAU
Old Skool
 
TFaudree_ERAU's Avatar
 
Join Date: May 2006
Location: Virginia is for Lovers, yacht chasing on the weekends
Posts: 1,774
Send a message via AIM to TFaudree_ERAU
Default Re: Changing Runway Ops

A few delay vectors for the arrivals going to the new runway, and maybe an aircraft or 2 landing downwind, hold the departures, and you're good to go. If its VMC with parallel runways, you can go with simultaneous opposite direction operations as described in 7110.65 3-8-4 and never have to inconvenience the departures.
TFaudree_ERAU is offline  
Old November 10th, 2006, 00:37   #7
flyguy
Old Skool
 
flyguy's Avatar
 
Join Date: Apr 2002
Location: Denver, CO
Posts: 2,071
Default Re: Changing Runway Ops

Wow! There's a lot of behind the scenes stuff that never really occured to me. It sure is nice to be the pilot and just do what they tell me.
__________________
"Roads?...Where we're going we don't need roads."
flyguy is offline  
Closed Thread

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


All times are GMT -4. The time now is 14:28.


Powered by vBulletin® Version 3.7.1
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.1.0
©2008 jetcareers.com