Re: PBS.....grrrrrr!
Yes and Yes. But the problem lies in that he should not have had that trip. He wanted to work 9 days there not 11. For him 6 is enough. That trip had to be an IRO trip (DH over) because of 32/7 with the 2 previous Europe trips. The trip should have been a 3day IRO on a 767. I went through the trips awarded to junior people and made a schedule that should have passed his first realistic bid group, with all 767 flying on 3 day trips. There was also a BCN 757 trip stuck in his schedule too.
PBS alows the company to F$^( the pilots how they see fit. End of story.
__________________
As a wise man said, sumb!tch flew in, sumb!tch'll fly out.
Ski Hard. Party Harder.
|